Quick answer: Hospital operation theatre design in the UAE follows the emirate’s regulator: DHA in Dubai, DOH in Abu Dhabi and MOHAP elsewhere. All three build on ASHRAE 170, so the core numbers match. Expect about 20 air changes with 4 fresh, HEPA filtration, positive pressure, 18 to 24 °C and 20 to 60% humidity. UK-affiliated groups add HTM 03-01 and US groups add FGI. Inspectors then check the commissioning file, not the brochure, so hospital operation theatre design must end in test reports.
Planners ask which standard applies when the operator is British, the regulator Emirati and the consultant American. So here is how the standards relate in hospital operation theatre design, and what the inspector asks to see.
Which standard governs hospital operation theatre design in each emirate
In Dubai, the DHA Health Facility Guidelines Part E set the HVAC rules for licensing. Abu Dhabi’s DOH uses its own standards on the same basis, while MOHAP covers the northern emirates. Because all three draw on ASHRAE 170, a theatre that meets one usually meets the others. Private groups then add a parent standard to hospital operation theatre design: HTM 03-01 for British operators, FGI for American ones.

The numbers side by side
- Air changes: about 20 per hour with 4 fresh under DHA and FGI, but about 25 under HTM 03-01.
- Pressure to corridor: positive, with 10 Pa recommended in the UAE, whereas HTM 03-01 asks for about 25 Pa.
- Temperature: 18 to 22 °C in Dubai, then 18 to 25 °C under HTM 03-01 and 20 to 24 °C under FGI.
- Humidity: 20 to 60% everywhere, although HTM 03-01 narrows it to 35 to 60%.
- Filtration: H14 HEPA in the UAE and on UK ultra-clean canopies, while FGI asks for MERV 14 plus HEPA where specified.
The list shows why one design can satisfy everyone. However, it also shows where hospital operation theatre design must pick a side: air changes and pressure.

Where the standards differ, and what to do
HTM 03-01 asks for roughly 25 air changes and 25 Pa, while the UAE regulators accept about 20 and 10 Pa. For a British-run hospital, we size the AHU for 25 air changes and the doors for 25 Pa. Then we commission to DHA and record both sets of results. The extra capacity adds 8 to 10% to the AHU, but it avoids a second validation later. Similarly, an FGI room class decides the floor area, as our modular operating room guide covers.

What the inspector checks at handover
The licensing inspector does not measure the room. Instead, they read the file. It must contain approved drawings, the air balance report, HEPA leak tests for every terminal and the particle count at the table. It also needs the pressure log, temperature and humidity records, the recovery test and the IQ, OQ and PQ protocols. A missing HEPA report is the commonest first-inspection failure, so our OT validation team indexes the file before submission.

Hospital operation theatre design beyond the theatre
The theatre is one room in a suite, and the inspector licenses the suite. The anaesthetic room, scrub bay, sterile store and dirty utility each carry their own pressure and air figures. Together they form a cascade from the theatre outward. For example, the theatre sits at 10 Pa, scrub and sterile store at about 5 Pa, and the dirty utility negative. The laminar operation theatre then sits at the top of that cascade. Isolation rooms, covered in our isolation room design guide, sit at the bottom.

Frequently asked questions
Which standard applies to hospital operation theatre design in Dubai?
The DHA Health Facility Guidelines, which build on ASHRAE 170. DOH and MOHAP apply the same basis elsewhere.
Does hospital operation theatre design in the UAE need HTM 03-01?
Only if the operator or its accreditation requires it. Then design to 25 air changes and 25 Pa, and commission to the UAE regulator too.
What temperature and humidity do the regulators want?
About 18 to 22 °C and 20 to 60% humidity in Dubai; HTM 03-01 narrows humidity to 35 to 60%.
What fails inspection most often?
A missing or failed HEPA leak test report, then pressure that drops when the doors cycle.
Does the design need a validation contract?
Yes. Without IQ, OQ and PQ documents the file is incomplete, so write validation into the supply contract.